The Shuriken Korean Lever PCB will come without the switches installed. The main part that keeps the PCB in place are the screws that are installed on a lever to secure the switches. Follow the steps below for installation procedure. The below installation examples are with a Taeyoung Fanta Lever.
1. Unscrew all switches and remove from the lever body

2. Install switches onto Shuriken Korean Lever PCB. Switch can enter the clip from above or from the side. Make sure it is fully inserted and the holes on the PCB can be seen through the holes of the switch.

3. Place Shuriken Korean Lever PCB onto the lever housing, carefully aligning the pegs through the switch holes. Then re-install all screws.

4. Plug in the 5-pin wiring harness into the pin headed

5. Installation is complete and ready to use!
In the case of 0.187in switches, it is advisable to use a needle nose plier to slightly bend the terminals forward for better contact. This can be demonstrated as below.
For 0.250in switches, no bending is necessary. When changing 0.250in switches to 0.187in switches, it is advisable to pinch the terminal close to allow for a better electrical connection.
